Facilities and equipment
Facility design that prevents cross-contamination, plus an equipment maintenance and calibration plan.
Raw material control
Verifying every raw material batch received, with its certificate of analysis and quarantine until release.
Packaging materials
Quality control of packaging materials, consistent with the rest of the raw materials.
What an auditor usually asks for
- Equipment maintenance and calibration plan
- Raw material receiving and quarantine procedure
- Certificates of analysis filed by batch
- Packaging material control documented
How to cover this block in Kimobox
- 1Log equipment maintenance and calibration as scheduled records in Kimobox.
- 2Manage raw material quarantine and release from the same system.
- 3File certificates of analysis linked to each batch received.
Every raw material batch stays traceable with its certificate of analysis and quarantine status.
ISO 22716 templates and records in this chapter
- ISO 22716 raw material receipt and release record · Mandatory record
- ISO 22716 equipment cleaning and sanitisation record · Mandatory record