Eliminating hazards and reducing risks
Apply the hierarchy of controls: eliminate the hazard, substitute it, engineering controls, signage or administrative controls, and PPE as the last resort.
Management of change
When processes, equipment or working conditions change, evaluate the safety impact before introducing the change, not after.
Contractor coordination
When several companies work at the same site, prevention must be coordinated: exchanging risk information, verifying training and fitness, and controlling access.
What an auditor usually asks for
- A documented hierarchy of controls for each significant risk
- A safety impact assessment record for every change
- Up-to-date contractor coordination documentation for every contractor
- Access control for external personnel at every site
How to cover operation in Kimobox
- 1Document the hierarchy of controls for each risk directly on the process map.
- 2Manage contractor coordination with every contractor from the CAE module.
- 3Control external personnel access with OH&S documentation verified before entry.
Every contractor's documentation gets verified before their people set foot on site, not after the accident.