Inspection and testing
Defined inspection and test plans to verify items meet requirements before acceptance.
Measuring equipment control
Periodic calibration of measuring, inspection, and test equipment used in safety-related activities.
Inspection status
Clear identification of each item's inspection status to prevent its use before verification.
What an auditor usually asks for
- Inspection and test plans documented
- Measuring equipment calibration program
- Inspection status identification for each item
- Log of inspection and test results
How to cover this block in Kimobox
- 1Log inspection and test plans per item in Kimobox.
- 2Schedule measuring equipment calibration as periodic records.
- 3Document each item's inspection status on its record.
Every piece of equipment's calibration and inspection status stays visible and under control.
UNE 73401 templates and records in this chapter
- Nuclear inspection and test plan (ITP) template · Mandatory record