Procurement control
Assessment and approval of suppliers of equipment and services relevant to nuclear safety.
Identification and control of items
Traceability of components and materials from their origin through installation at the plant.
Special process control
Qualification and control of processes whose result cannot be fully verified by subsequent inspection, such as welding.
What an auditor usually asks for
- Supplier approval criteria documented
- Component traceability from origin through installation
- Special processes qualified and controlled
- Log of procurement for safety-related items
How to cover this block in Kimobox
- 1Assess and approve suppliers from Kimobox's supplier portal.
- 2Log the traceability of each component linked to its installation process.
- 3Document special process qualification as a version-controlled record.
Each component's traceability stays intact from origin through installation, with nothing rebuilt by hand.
UNE 73401 templates and records in this chapter
- Nuclear supplier evaluation under UNE 73401 · Mandatory record
- Commercial grade dedication of items for nuclear use · Mandatory record
- Special process qualification: welding and testing · Mandatory record